2009 Year-end Report: Number of ramps built this year 22 Ramps removed & recycled 16 Total cost of lumber $3700.00 Average cost per ramp $168.00 Value of all ramps if new $11,120.00 Total value per ramp $505.00 Total Volunteer/Man Hours 736 Average Man/hours per ramp 34 Where ramps were constructed: Avoca (3), Bath (8), Beaver Dams (1), Cameron (1), Canisteo (1), Caton (1), Cohocton (1), Painted Post (3), Wallace (1), Wayland (1), Wheeler (1). The last ramp of this season was their 240th during the twelve years of the association! If stretched end to end - it would represent a single ramp one and a quarter miles long ! ! ! They feel blessed to be able to have helped at least 240 people have access to ground level. Life is good - and God is GREAT.
|
|